Saroj Shah
24 Oct, 2026 · 10 min read
Table of Contents
- What commercial bridging finance does
- Why speed is the wrong first question
- What breaks first when the date slips
- Bridging or a caveat structure: which fits
- What the lender wants to see before it moves
- What a short-term facility actually costs
- The three risks that matter
- Who this is for
- What these facilities are used for
- Where we work
- How to start
- Frequently asked questions
Two businesses call about the same property on the same day. One settles. The other is still waiting when the contract lapses. The difference is almost never the property.
The short version
- Commercial bridging exists to solve a timing problem. If there is no date, there is usually no deal.
- The lender's first question is not what the security is worth. It is how you will repay.
- Speed is decided by the exit, the valuation and the legals, not by how urgent the request sounds.
- Pricing is a cost of timing, not a cost of capital you should plan to carry.
- This is business-purpose finance for a facility above $500,000, two or more years of trading, and a defined repayment event.
- Consumer and owner-occupied lending is a different regime with different rules, and it is not this.
What commercial bridging finance does
It funds a commercial transaction across a timing gap: a settlement date, a signed contract, or a purchase that must complete before longer-term money is in place. The facility is short by design, commonly written for up to twelve months, and it is repaid from a defined event rather than from trading cash flow.
That distinction matters. A business loan is sized against your financial position. Bridging is sized against the gap between the date you have and the money you can reach by then.
Why speed is the wrong first question
Because timing is not decided by urgency. Three things govern it, and none of them is how quickly the application was submitted.
The exit has to be credible, meaning a named repayment event with a date attached. The security has to be valued or otherwise assessed, which for second-position lending is the whole decision. And the legals have to be documented and executed, which takes as long as it takes.
This is why the honest answer changes the conversation. Any lender that gives you a settlement date before it has seen the exit is guessing, and the guess usually lands on the borrower.
What breaks first when the date slips
The deposit, then the contract, then your position on everything that follows. Most commercial contracts make time of the essence at specific points, and once a finance date passes without funds, the vendor is entitled to treat the contract differently.
The commercial damage is normally larger than the interest on the facility. Which is why the right question is never "what does bridging cost" in isolation. It is "what does missing this date cost, and is the facility cheaper than that".
Bridging or a caveat structure: which fits
Both are short-term and both are secured against property. The difference is where the lender sits in the queue, and that decides the pricing and the available headroom.
|
Structure |
Position |
Typical use |
The constraint |
|
First mortgage bridging |
First |
Unencumbered purchase, refinance, auction |
Property must be free, or the existing lender discharged in the same transaction |
|
Caveat or second mortgage |
Second |
Equity release without disturbing the first lender |
Capped by the headroom above existing debt, not by property value |
|
Development bridging |
First, staged |
Construction and staged drawdowns |
Needs approvals, a costed programme and a credible end value |
The choice is rarely preference. It is arithmetic. How much equity sits above the current debt is the ceiling on any second-position facility, and that ceiling is often lower than the owner expects.
The mechanics of second-position and caveat lending are set out in more detail on the caveat loan page.
What the lender wants to see before it moves
Five things, and they all point at one question: can this be repaid on a predictable date.
|
Document |
What it tests |
|
The contract or the triggering event |
That the date is real and the amount is fixed |
|
The exit |
The repayment mechanism, with a date in it |
|
Valuation or acceptable security assessment |
The available headroom, especially in second position |
|
A costed programme, for development |
Whether the money is sufficient, not merely available |
|
Borrower entity and guarantors |
Who is actually obliged |
An exit described as "we will sort something out" is not an exit. This is the most common reason a commercial bridging application stalls, and it is entirely avoidable. If you can state the exit in one sentence with a date in it, you are most of the way to a credit decision.
What a short-term facility actually costs
The headline interest rate is one line in a longer bill. A commercial bridging facility typically carries several separate charges.
|
Charge |
What it covers |
|
Establishment or facility fee |
Documenting and setting up the facility |
|
Interest |
Charged at short-term rates, above bank equivalents, for the period drawn |
|
Renewal or line fee |
Applies if the facility is extended or rolled |
|
Valuation |
Typically at the borrower's cost |
|
Legal documentation |
Both sides, commonly both at the borrower's cost |
|
Early repayment or exit fee |
Sometimes charged if the facility clears earlier than contracted |
Compare offers on total cost across the expected term at your likely drawn balance. Two facilities with different rate and fee splits produce materially different totals on the same transaction, and the lower rate is frequently not the cheaper facility.
The structural point is that bridging is a cost of timing, not a cost of capital you should plan to carry. Used properly it is a transaction expense. Used as a substitute for the longer-term funding that was never arranged, it becomes expensive debt with a deadline attached.
The three risks that matter
Cost. Short-term and second-position money prices well above bank debt. Defensible when it protects a transaction. Not defensible as ongoing working capital.
Exit failure. If the sale falls through, the refinance is declined or the contract does not settle, you are holding an expensive facility with a maturity date against an asset you would rather not lose. Extensions exist, cost more, and require the lender's agreement. Plan the downside case, not just the expected one.
Over-commitment. The damaging version is using property equity to fund a business problem equity cannot solve. If the underlying business does not generate the repayment, the facility has moved the problem rather than fixed it, and it has moved it onto the security.
Who this is for
A facility above $500,000, at least two years of trading, a business purpose, and a defined event that repays it.
Consumer and owner-occupied lending operates under a different regulatory regime with different disclosure obligations. If the requirement is a home loan, the right conversation is with a residential broker rather than a commercial one.
Below the threshold this article describes, the mechanics are covered on the bridging finance service page.
What these facilities are used for
Across the commercial bridging enquiries we handled in the past twelve months, four situations accounted for most of them. If you recognise yours, the structure will already be familiar to a lender.
A settlement gap on a purchase. The most common by a wide margin. The contract is unconditional, the deposit is paid, and the longer-term funding will not be in place in time. It is the cleanest use of bridging because the exit is the refinance that was always intended.
Staged construction and development funding. One enquiry involved a duplex project in Northmead requiring about $1.8 million, structured so funds released against stages rather than in one draw. Another sought $760,000 over two years to cover soft costs before the main facility was needed. A third needed around $750,000 released progressively as stages completed. Staged structures exist because the requirement is uneven, and a single lump sum either over-funds the early months or runs out in the last ones.
Exiting an existing short-term lender. Refinancing away from expensive debt was the second most common driver. It is legitimate, with one hard condition: the new facility has to be genuinely cheaper or genuinely longer. Rolling one short-term loan into another is how borrowers end up worse off than they started.
A fixed obligation with a deadline. Tax debt and creditor arrangements create dates that do not move, and property-secured short-term finance is sometimes the only way to meet one without selling under pressure. This is where exit discipline matters most, because meeting the deadline does not fix the underlying cash flow.
Where we work
We arrange commercial finance for businesses in Sydney, Melbourne, Brisbane, Adelaide and Perth. Short-term commercial facilities are placed nationally and lender choice is not limited by your state. Security location can affect valuation and some lenders' appetite, so tell us where the property is early.
How to start
Bring us three things: the date, the amount, and the exit. That is the whole first conversation and it commits you to nothing.
From there we can tell you whether a first mortgage or second-position structure is viable, what headroom your existing debt actually leaves, and whether the exit you have in mind is one a lender will accept. If bridging is the wrong tool, we will say so, and point you at debtor finance or a business line of credit instead.
Talk to a broker about your settlement date
Frequently asked questions
How long does commercial bridging take to settle?
Indicative terms can usually be given early, but settlement requires the security to be valued and the documents executed. Nobody can give you a firm date before those two steps are complete, and any figure quoted earlier than that is an estimate rather than a commitment.
Will a lender accept a first mortgage, or does it have to be second position?
Both structures exist. First mortgage bridging suits an unencumbered property or a refinance where the existing lender is discharged in the same transaction. Second position is used when you want to leave an existing facility in place, and it is capped by the equity above that debt.
What happens if my sale falls through and I cannot repay on time?
Raise it with the lender immediately rather than at maturity. Extensions are sometimes available but require consent and usually cost more. This is why the exit should be assessed on the downside case, and why a structure that only works if everything goes right is a poor one.
Do I need a valuation?
For most property-secured short-term facilities, yes, or an acceptable alternative assessment. Valuation is one of the two steps that govern timing, along with legal documentation, and for second-position lending it is the single biggest determinant of how much is available.
Can commercial bridging be used to pay ATO debt?
Yes, and it is a common use where a fixed obligation has created a date that cannot move. The condition is that the exit still has to be real. Meeting a deadline with property-secured debt does not solve the underlying cash flow issue by itself.
How is commercial bridging different from a business loan?
A business loan is sized against your overall financial position and repaid from trading cash flow over a longer term. Bridging is sized against a specific date and repaid from a specific event, which is why the assessment focuses on the exit rather than on serviceability alone.
Can a bridging facility be extended?
Often, subject to lender consent and additional cost. Extensions are usually measured in months rather than years, and they are easier to obtain when the reason for the delay is documented and the exit remains credible.